[PSUBS-MAILIST] test pool

Cliff Redus via Personal_Submersibles personal_submersibles at psubs.org
Fri Jan 31 15:51:32 EST 2020


 No problem if your foundation can take 58K lb load if the thing was fully filled.  Will be flimsy until you fill it.   Even then, since you cannot fill it completely due to future insertion of the E3000, unfilled section will be flimsy until the E3000 is inserted.  For safety I would weld some kind of flange on upper edge after it is filled.   
I like your dig a hole in the backyard with a liner concept better.  
Have you ever heard of the virtue of patience!  If you moved to Texas, you could work year round outside.
Cliff
    On Friday, January 31, 2020, 02:29:11 PM CST, hank pronk via Personal_Submersibles <personal_submersibles at psubs.org> wrote:  
 
 Hi All,I don't think I am patient enough to wait for the ground to thaw to put E3000 in a pool.  So Last summer I bought a heavy pool liner for a round above ground pool.  I want to make a round pool in my shop on top of the concrete floor.  I want to make it from 16 gauge sheet cold roll steel, 6 feet high and 14 feet diameter.  I stick weld the joints with an overlap.  Do you engineer types see any issue with this before I pull the trigger?Hank_______________________________________________
Personal_Submersibles mailing list
Personal_Submersibles at psubs.org
http://www.psubs.org/mailman/listinfo.cgi/personal_submersibles
  
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.whoweb.com/pipermail/personal_submersibles/attachments/20200131/69b74542/attachment.html>


More information about the Personal_Submersibles mailing list